Since the inception, Eastern Coalfields Limited has taken up various activities for the welfare of its workers as well as development of people/communities living in the surrounding areas of the mines. In addition, lot of activities have been attended for the development of infrastructure, industrial structure, roads and railway sidings, residential building, water supply and other welfare activities etc. Brief description is as below:-

Residential Building:

There are altogether 91180 number of residential houses in the company, out of which 62960 numbers are standard quarters and 28220 numbers of non-standard houses. At present housing satisfaction is more than 118%. Regular repairing and maintenance of these quarters are being attended. Additionally, under Block Repairing concept, thorough repairing of complete blocks of residential quarters is being taken up. During 2015-16 a budget of Rs.28.22 crore was provided for block repairing and about 4135 quarters were thoroughly repaired under this programme.

Welfare Buildings:

a) Hospitals - 13 b) Dispensaries - 115
c) Canteens - 82 d) Rest Shelters - 137
e) Multipurpose Institutes - 12 f) Adult Education Centres - 03
g) Community Centres - 54    

Water Supply:

ECL has always given special attention for the improvement of potable water supply to the occupants of our residential houses as well as to the people of nearby communities. There are 22 numbers of slow sand filters, 20 numbers rapid gravity filters to provide filtered and treated potable water to the employees and their dependents. There are also 11 numbers of river bed bore wells.

In addition to this ECL has also participated with RCFA-1 and RCFA-2 water supply schemes of West Bengal government and Chirkunda water supply scheme of Jharkhand Govt. for augmenting the source of water and water is served to a population of 5,40,000. In the year 2015-16, 5 nos. of pressure filter and electro chlorinators were commissioned.

INFRASTRUCTURE DEVELOPMENT:

Dispatch of coal is one of the prime activities of ECL and it is being done effectively and efficiently. Coal is being dispatched mainly by the mode of roads and railways. ECL has taken proper steps in this regard. Detail description of some ongoing and new works is as below:-

  1. Roads- During the year 14 nos. of works for strengthening of coal transportation roads for a total length of 38.598 Km. (approx.) were completed for different Areas at a cost of Rs.2824.30 lakh.

    Additionally, during the year 2015-16, 3 nos. of works related to strengthening, widening and construction of coal transportation roads of total approximate length 12.15 Km were awarded and the total value is Rs.919.52 lakh.

    Other roads development works taken up during the year 2015-16 for facilitation of public movement in coalfields areas are as under:

    Sl. No.

    Name of Work

    W.O value

    ( Rs.Lakhs)

    Status

    1

    Construction of Diversion Road to Bhatmura-Jhanjra from NH-60 at Sonepur Bazari Project of Sonepur Bazari Area.

    239.36

    Work completed.

    2.

    Construction of concrete road in Sec-I and Sec II colony of Jhanjra Area ECL. (colony road)

    67.97

    Work completed.

    3

    Construction of peripheral road, with 06 nos. culverts to connect Nabagram Village with the road to Jhanjra and NH-60 under Sonepur Bazari Project.

    281.80

    Work is in progress.

    4

    Construction of road over bridge at Barasimara Zero Point, Rajmahal Area, ECL.

    926.73

    Work is in progress.


    Total value

    1447.89


  2. Railway siding, wharf wall etc.-

    Sl. No.

    Name of Work

    W.O Value

    ( Rs.Lakhs)

    Present Status

    1.

    Construction of concrete wharf wall R.C.C. boundary wall, R.C.C. culvert, Pucca drain and earth filling in platform (including yard) at Dalurband- Pandaweshwar Railway Siding at Dalurband Colliery under Pandaveswar Area.

    111.20

    Work completed.

    2.

    Construction of RCC wharf wall at J.K. Nagar Railway Siding under Satgram Area.

    164.61

    3.

    Construction of 335 Mtr RCC Wharf wall at Bahula Siding under Kenda Area

    86.94

    4.

    Complete track renovation works at Shankarpur Railway Siding under Sonepur Bazari Area.

    104.32

    5.

    Complete track renovation works at Jambad (Bahula) railway siding under Kenda Area.

    496.97

    6.

    Complete track renovation works at Khas Kajora Railway Siding under Kajora Area.

    191.66

    7.

    Complete track renovation works at Bankola no. I Siding under Bankola Area.

    46.07

    8.

    Complete track renovation works at Belbaid Siding under Kunustoria Area

    189.38


    Total

    1391.15


  3. Mine Development works: To achieve the increasing annual targets of coal production to meet the demand of coal for power and other sectors, various mine development activities have been taken up during the year 2015-16. Some of the major mine development activities completed during the year are as follows:

    Sl. No.

    Name of Work

    Work order value

    (in Rs. lakhs)

    1

    Construction of drivage of new incline at Khottadih Colliery under Pandaweshwar Area.

    374.68

    2

    Construction of drivage of incline shaft parallel to main incline from surface to R-VII seam at Jhanjra Area.

    348.83

    3

    Construction of concrete pavement for longwall mining equipment at MIC, Jhanjra Projects, Jhanjra Area.

    834.30

    4

    Floor concreting of 2nd incline shaft from R VI Seam to surface except 135 m from surface at MIC of Jhanjra Project Colliery, Jhanjra Area.

    286.21


    Total

    1844.02

  4. Other works: ECL is also providing funds to State Govt. and other District Board Authorities for maintaining and upgrading State/District Board roads which are being used for transportation of coal from mine to siding/coal depot. Details of roads completed during the year 2015-16 are as below –

    Sl. No.

    Name of Work

    Contribution by ECL ( Rs. in Lakh)

    Present Status

    1

    Repairing/Restoration of the Zillah Parishad road from Bankola rail gate to Ukhra village (Approximate length–6.30 km) under Pandaveswar P.S in the district of Bardhhaman for Bankola area ECL.

    466.38

    Work is being executed by Bardhhaman Zilla Parishad.

    2

    Strengthening of pavement from 5.50 km to NH-60 (Ghaighata More), construction of Rigid Pavement length 255 meters (Phase-1), placement of cement concrete block length 555 meters (Phase-2) and construction of roadside drain 450 meters (Phase-3)

    128.96

    Work is being executed by PWD, Asansol Division.


Skill Development Drinking Water Facility Skill Development Skill Development
Skill Development Mobile Medical Van Solid Waste Management Construction of ITI Lalmatia
Water Supply through Tanker Water Supply through Tanker Swaccha Vidyalaya Programme Swaccha Vidyalaya Programme


CAREER WITH CIL    |    ECL IN MEDIA    |    SITE MAP    |    CHECK MAIL    |    CIL CORPORATE GEET    |    IMPORTANT LINKS    |    MARKET    |    HINDI

SUGGESTION BOX    |    PUBLIC GRIEVANCES    |    HOUSE JOURNAL    |    CORPORATE GOVERNANCE
Best viewed on 1024 x 768 screen resolution or higher.

DISCLAIMER: Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.

Copyright © 2014 EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL