QUALITY CONTROL


Quality Improvement:-

In 2012-13, 98.20% confirmed to billed grade for dispatches of coal covered under agreed sampling arrangement as compared to 89.66% grade confirmation achieved in 2011-12 on sampled quantity.

Details of Sampling
2012-13 2011-12
% of Grade conformation
98.20
89.66
No. of samples with one grade slippage.
332
811
% of one grade slippage
5.70
10.15
No. of samples with two grade slippage & more
46
15
% of two grade slippage & more
0.78
0.18

Against MoU Target of 100% for despatch covered under agreed sampling of coal to power sector actual achievement is 100%. Against MoU Target of 90% for establishing mechanism through a publicized website for handling of consumers complaint & no Complaint should be kept pending for more than three months, the actual achievement is 95%.

Quality deduction:

The grade confirmation has increased over last year and the quality deduction in 2012-13 was ` 28.51 per tonne compared to ` 53.60 per tonne in 2011-12.

Year
Total quantity dispatched
(Rail & Road)
(in Lakh tonne)
Amount of Deduction
(in Lakh Rs.)
Deduction
Rs./Tonne
2012-13 355.42 10134.50 28.51
2011-12
303.40 16252.84 53.60

[N.B.:  Amounts calculated on the basis of basic price of RoM (-250mm) coal.]

WEIGHMENT & SIZING STATUS:

Weighment Status:

Weighment under EPS was 99.08% of total despatch in 2012-13. The quantity weighed in EPS has increased by 17.09% from 300.74 Lakh Tonne in 2011-12 to 352.15 Lakh Tonnes in 2012-13. In 2012-13, quantity weighed in EPS for supplies account Power houses & others compared to last year is below:

Details
2012-13
2011-12
Power EPS
Other Consumers
Total
Power EPS
Other Consumers Total
Qnty. Despatched (by Rail) (in L/T) 300.21
55.21
355.42
246.36 57.04 303.40
Qnty. Weighed under EPS (in L/T) 297.02
55.13
352.15
244.19 56.55 300.74
Weighment % under EPS
98.94
99.85
99.08
99.12 99.14 99.12

Sizing Status:

The total despatch of coal in 2012-13 was 355.42 Lakh Tonne of which the sized coal despatch by Mechanical Crushing/UG coal to Power sector by Rail was 82.83%. The quantity of sized coal in CHP/FB/UG has increased by 8.94 % from 263.26 Lakh Tonne in 2011-12 to 286.80 Lakh Tonne in 2012-13. In despatches from sidings other than CHP/FB facility, sizing was done by Dozer and thus 100% sized coal was despatched. To achieve supply of 100% mechanically crushed coal to Power Houses, action has been initiated from few Areas namely Rajmahal and S.P. Mines. The details are given below.

Details
2012-13
2011-12
Power
Other
Total
Power
Other
Total
Qnty. Sized in CHP/FB (L/T)
248.66
38.14
286.80
217.22
46.04
263.26
%
82.83
69.08
80.69
88.17
80.70
86.01
DZR/MNL 51.55 17.01 68.62 29.14 11.00 40.14
% 17.17 30.92 19.31 11.83 19.30 13.99
Total 100 100 100 100 100 100





CAREER WITH CIL    |    ECL IN MEDIA    |    SITE MAP    |    CHECK MAIL    |    CIL CORPORATE GEET    |    IMPORTANT LINKS    |    MARKET    |    HINDI

SUGGESTION BOX    |    PUBLIC GRIEVANCES    |    HOUSE JOURNAL    |    CORPORATE GOVERNANCE
Best viewed on 1024 x 768 screen resolution.

DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.

Copyright © 2012 EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL