Production performance of the Company in 2016-17 against the target as well as compared to last year was as under:

Particulars

Unit

2015-16

2014-15

Growth Over Last Year

Target

Actual

Achieved (%)

Actual

Absolute

%

1. Production :

i) Raw Coal -UG

-OC

Total

ii) Coking Coal

- Blendable

- Others

iii) Non-Coking

M. Te.

8.646

38.294

8.127

32.391

93.99

84.58

7.329

32.880

0.798

-0.489

10.89

-1.49

46.940

40.517

86.32

40.209

0.308

0.77

0.00

0.00

46.940

0.000

0.031

40.486

-

100.00

86.25

0.000

0.012

40.197

0.00

0.019

0.289

-

158.33

0.72

2. O.B. Removal

M CuM

141.00

124.637

88.39

119.22

5.417

4.54

3. Productivity(OMS)

Tonnes







- Underground

0.664

0.642

96.69

0.56

0.082

14.64

- Opencast

14.940

12.905

86.38

12.42

0.529

3.90

- Overall

3.010

2.672

88.77

2.56

0.114

4.38

CONSTRAINTS IN COAL PRODUCTION:

Sl. No.

Reason for loss in production

Quantity (MT)

1

Geological disturbances

0.143

2

Machine breakdown

0.009

3

Water logging due to rainfall

0.685

4

IR problem

0.320

5

Land acquisition

0.595

6

Others

(Accident at Rajmahal Project on 29.12.2016, subsequent restrictions imposed by DGMS at other OC projects, Dispatch constraints, Rehabilitation issues, EC, FC, etc)

5.445


Total

7.197

SYSTEM CAPACITY UTILISATION:

(Figures in %)

Particulars

2016-17

2015-16

Target

Actual

Achieved (%)

Actual

a) UG

85.64

80.50

94.00

77.64

b) OC (Dept.) Excv.

93.52

68.05

72.77

92.59

c) OC (Hired) Excv.

100.90

93.75

92.91

133.67

d) OC (Dept.+ Hired) Excv.

98.97

87.02

87.93

117.95

e) Total [UG+OC(D)]

92.48

69.64

75.30

88.90

f) Overall (UG+OC) (Hired+Dept.)

98.47

86.78

88.13

116.04

COAL PRODUCTION IN MT


   
         
   
         

CAREER WITH CIL    |    ECL IN MEDIA    |    SITE MAP    |    CHECK MAIL    |    CIL CORPORATE GEET    |    IMPORTANT LINKS    |    MARKET    |    HINDI

SUGGESTION BOX    |    PUBLIC GRIEVANCES    |    HOUSE JOURNAL    |    CORPORATE GOVERNANCE
Best viewed on 1024 x 768 screen resolution or higher.

DISCLAIMER: Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.

Copyright © 2014 EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL