PLANNING

Command Area of Operations:

There are 14 number of operating areas with 87 number of working mines, 60 being underground mines, 19 opencast mines and 8 mixed mines.

Target and Actual for 2016-17 and Target for 2017-18:

SL No

Particulars

2016-17

2015-16

2017-18

Target (BE)

Actual

Actual

Target

1

Production (Mt)

46.94

40.521

40.209

51.70

2

Overall Productivity

3.01

2.674

2.56

3.41

3

Plan Expenditure (` in crore)

1150.00

827.80

754.71

1050.00

Research and Development:

CIL R&D Project:

Detailed status of implementation of ongoing R&D Projects funded under R&D grant of CIL is enclosed as Annexure –I.

S&T Projects :

Detailed status of implementation of ongoing S&T Research Projects funded under S&T grant of MoC is enclosed as Annexure –II.

Modernization of Coal Industry:

In order to increase the level of modernization and mechanization in underground mines, intermediate technology deploying LHD/SDL was introduced in 62 no of mines of ECL till 2016-17. As on 31.3.2017, 274 no of SDLs and 30 no of LHDs were on roll in different underground mines of ECL. During 2016-17, production achieved from 274 no of SDLs was 4.44 Mt., from 30 no of LHDs was 0.88 Mt and from 1 no of Dosco is 0.10 Mt.

“Mass production technology” by deploying Continuous Miner combined with Shuttle car had been deployed at Jhanjra and Sarpi projects. Jhanjra Longwall panel commissioned in August, 2016. In addition to above the following steps are being taken for modernization of Coal Industry:

  1. Coal Bed Methane (CBM): PR is under preparation for exploration and exploitation of CBM in ECL mining lease hold areas.
  2. Excavation: To increase operational efficiency through ergonomics, it has been made mandatory for all the HEMMs to come fitted with AC cabins for the operators. The process is on for replacement of rope shovels with the hydraulic shovels. Latest technology is being increasingly used to enhance safety aspects in HEMMs. Surface miners are also being deployed in OC mines wherever technically possible.
  3. Highwall Mining: The highwall mining is being introduced in Nimcha and Sripur Colliery.
  4. Man riding system has been functional in Parasea and Jhanjra colliery.

Steps taken to improve underground production:

Considering the various operational constraints, liquidation of upper seam, delay in availability of land for caving etc. action has been taken to improve underground production mainly by introduction of mass production technology deploying Continuous Miner with Shuttle Car in more number of underground mines in XII Plan like Jhanjra Low height CM, Kumardihi B, Khottadih, Tilaboni, Shankarpur, Siduli apart from gradual phasing out of manual operations with the intermediate technology. Action has also been taken to introduce more UDMs keeping in view of shortage of Drilling gang due to superannuation and the dual purpose of availability of more coal at face and supporting as well.

Details of Project Formulation during the year:

Sl. No.

Name of the project

Capacity (MTY)

Estimated Capital (` in crore)

1

Nakrakonda-Kumardih- B OCP

3.00

418.46

2

Mohanpur Expansion OCP(Phase-II)

2.50

389.19

3

Khottadih Expansion OCP

1.60

140.25

4

North Searsole OCP

2.00

348.89

5

Siduli OC + UG

OC:1.20

UG :1.55

507.72

6

Nabakajora-Madhabpur OC+UG

OC- 1.25

UG-1.44

564.98*

7

Sarpi Expansion UG

1.41

196.45*

8

Tilaboni UG

1.86

762.98*

9

Narainkuri OCP

2.50

922.42*

* Project Report is under modification.

Details of Projects approved by Board of Directors of ECL during the year:

SL. No.

Name of the Project

Capacity (MTY)

Approved Capital Investment (` Cr)

Date of Approval

1

Nakrakonda-Kumardih- B OCP

3.00

418.46

30.11.2016

2

Mohanpur Expansion OCP(Phase-II)

2.50

389.19

30.11.2016

3

Khottadih Expansion OCP

1.60

140.25

01.02.2017

4

North Searsole OCP

2.00

348.89

01.02.2017

Details of Projects approval and recommendation of ESC of CIL Board for seeking approval of CIL Board during 2016-17:

SL. No.

Name of the Project

Capacity (MTY)

Approved Capital Investment (` Cr)

Date of Approval

1

Khottadih Expansion OCP

1.60

140.25

31.03.2017

Details of Projects approved by Board of Directors of CIL during the year:

SL. No.

Name of the Project

Capacity (MTY)

Approved Capital Investment (` Cr)

Date of Approval

1

Jhanjra Combined PR

3.50

602.86

03.05.2016

2

RCE of Khottadih-OCP

1.50

60.10

03.05.2016

3

Hura-C OC

3.00

359.69

20.07.2016

Capital Projects/Schemes:

  1. No. of new Projects: 1 (Hura-C OC)
  2. Expansion/Revision/Foreclosure of Projects: 2 (Jhanjra Combined PR, REC of Khottadih –OC)
  3. Others – 14
  4. Total – 17

New Initiatives and Future Programme:

Following initiative have been taken in 2016-17 for augmentation of production from underground and opencast operation:

  1. Introduction of High-wall Mining: The following patches/sites have been identified for introduction of Highwall Mining Technology in ECL:

    SL No

    Name of the Block/Seam

    Estimated extractable reserve (Mt) for maximum drivage length

    Land required (Ha)

    300 Meter

    250 Meter

    1

    Sripur /Taltore (R-I)

    0.86

    0.81

    81.61

    2

    Nimcha/(R-IXA)

    1.84

    1.66

    120.90

  2. Technological up-gradation and Modernization of existing UG mines: The existing underground mines which have been identified for Technological up-gradation and Modernization are Badjna, Shyampur B, Siduli, Ghusick and Nimcha. Project Report and Draft Project Report for Siduli and Ghusick have been prepared respectively. The Project Report for rest of the mines is under preparation at CMPDIL, RI–I. More over, for enhancement of production, study has been undertaken by M/s ISM Consortium in 23 nos. of UG Mines. This is as per the MoC/CIL’s directive. Interim Draft Report has been submitted in January-2017, which is under examination.
  3. Introduction of Mass Production Technology [Continuous Miner (CM)]: The following mines have been identified for introduction of CM:

    Sl. No.

    Name of the mine/project

    Capacity (MTY)

    Estimated Capital Expenditure (` in crore)

    1

    Khottadih CM

    0.60

    127.17

    2

    Kumardih-B CM

    1.02

    117.90

    3

    Jhanjra LHCM

    0.72

    Capital included in Combined PR

    4

    Tilaboni UG

    1.86

    762.98

    5

    Sarpi Expansion UG: 2 nos LHCM

    1.41

    196.45

    6

    Siduli UG

    OC:1.20

    UG :1.55

    507.72

    7

    Nabakajora-Madhabpur (OC+UG)

    OC- 1.25

    UG-1.44

    564.98

    8

    Parasea-Belbaid UG

    1.83

    1064.85

  4. Foreign collaboration/Technology Absorption-Adaptation and innovation: LOA for supply of 2 numbers of LHCM on hiring basis has been issued on 29.08.2016. Commissioning is expected to be completed in December-2017. Contract for supply and operation of Jhanjra R-VI Seam has been signed on 8th January 2013. Commissioning has been done in August-2016 and production started from18.08.2016.

Details of OC Patches approved during 2016-17:

Sl. No.

Name of OC Patches

Capacity (MTY)

Coal (MT)

OBR (Mcum)

Status

1

Gourandih Begunia OC Patch (Phase-1), Salanpur Area

0.189

0.189

0.69

Approved on 07.09.2016

2

RCE of Madhabpur OCP (Phase-I)

Kajora Area.

0.5

1.6

7.78

Approved on 01.02.2017

3

Egra OC Patch, Kenda Area

0.2

0.388

0.974

Approved on 18.03.2017

4

Gourandih Begunia OC Patch, Salanpur Area.

1.5

14.00

46.16

Approved on 18.03.2017

Details of major activities during 2016-17:

Sl. No.

Name of Project

Milestones

Target for the year

Achievement

1

Rajmahal Expansion OCP

Shifting of PAFs

150 Nos.

159 PAFs have been shifted.

2

Sonepur Bazari Expansion OCP

Completion of Shifting of PAFs (Phase-II)

380 Nos.

402 PAFs in Phase-II have been shifted including 195 PAFs during 2016-17.

3.

Jhanjra Combined UG

Finalization of Global tender for supply of package on hiring basis.

Mar-2017

LOA for supply of LHCM on hiring basis issued on 29.08.2016.

4.

Jhanjra Combined UG

Commissioning of PSLW equipment & start of production

Apr-2016

Commissioned & Production from PSLW equipment started from 18.08.2016.

5.

Jhanjra Combined UG

Commissioning of 800 Tonne Bunker

Dec-2016

Commissioned in December-2016.

6

Kumardih-B CM UG

Finalization of tender for incline drivage

Dec-2016

Work order for drivage of incline issued on 11.11.2016.

3.14 Project monitoring and Status of implementation:

Details given as Annexure – III (Separately)


CAREER WITH CIL    |    ECL IN MEDIA    |    SITE MAP    |    CHECK MAIL    |    CIL CORPORATE GEET    |    IMPORTANT LINKS    |    MARKET    |    HINDI

SUGGESTION BOX    |    PUBLIC GRIEVANCES    |    HOUSE JOURNAL    |    CORPORATE GOVERNANCE
Best viewed on 1024 x 768 screen resolution or higher.

DISCLAIMER: Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.

Copyright © 2014 EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL