Performance for the month of March 2010.

Parameters AAP Target  Actual % Achvd.
AAP Target
Actual L/Year % Growth
1. Coal Prodn. (M.Te)
UG 0.910 0.784 86.10 0.786 -0.30
OC (D) 2.084 2.539 121.80 2.259 +12.40
Total Departmental 2.994 3.322 110.95 3.045 +9.12
OC(H) 0.995
0.731 73.44 0.639 +14.34
Total Coal Production 3.990 4.053 101.59 3.684 +10.03
2. O.M.S. (Te) 2.303 2.320 100.72 2.038 +13.86
3. Despatch (M.Te) 3.318 3.060 92.24 3.201 -4.39
4. O.B.R. (M.Cum.) 5.695 5.746 100.89 4.264 +34.74
5. Composite Prodn.(M.Cum)
8.368 8.461 101.11 6.732 +25.68

Progressive performance April ‘09-March ‘10.

Parameters AAP Target  Actual % Achvd. AAP Target Actual L/Year % Growth
1. Coal Prodn. (M.Te)
UG 9.250 8.233 89.01 8.392 -1.90
OC (D) 15.870 17.498 110.26 15.727 +11.26
Total Departmental 25.120 25.731 102.43 24.119 +6.69
OC(H) 5.880 4.336 73.74 4.016 +7.96
Total Coal Production 31.000 30.067 96.99 28.135 +6.87
2. O.M.S. (Te)   1.526 1.463 95.89 1.328 +10.20
3. Despatch (M.Te) 30.602 28.797 94.10 27.849 +3.40
4. O.B.R. (M.Cum.) 52.000 49.962 96.08 43.069 +16.00
5. Composite Prodn. (M.Cum) 72.770 70.107 96.34 61.919 +13.22

During the month of March ’10 ECL has achieved 40.53 LT of coal production and 57.46 L.Cu.m of OB removal, which are highest ever achieved figures in a month since inception of the company. During the month of March’10 ECL has achieved AAP target for both coal production and OB removal.  During 2009-10 ECL has achieved 96.99% coal production and 96.08%  OB removal against AAP target. 

It may also be noted that ECL has achieved the MoU target for coal production which was fixed as 30 MT under “Very Good” rating.

However, in the month of March’10 also some quantum of coal production was lost due to following reasons:

1
Substantial quantity of underground production was lost due to suspension of production activities at Kunustoria Colliery due to its sealing off after fire.
2
Underground production suffered particularly at Mugma Area due to prolonged power failure.
3
Production from  OCPs at Rajmahal, Sonepur Bazari-B, Bankola etc suffered due to stoppage of production and despatch a number of times by unions/villagers on various demands.

Profitability:
During 2009-10 company achieved a profit of Rs. 152.36 crore (prov.)against a loss of Rs. 2109.09 crore during 2008-09.

Forestry clearance:
Forestry clearance of Hura ‘C’ project is pending with MoEF.

Introduction of Continuous Miner at Sarpi UG mine:

For augmentation of UG production a contract was signed with Joy Mining Machinery of UK in April 2009 for introduction of Continuous Miner at Sarpi UG mine.  Part of the consignment i.e. Shuttle Car Load Centre and Quad Bolter have arrived at Kolkata Port. However, the main equipment i.e. the Continuous Miner is expected to be shipped in April 2010.









Home Contact Us Site Map
Copyright © 2009 EASTERN COALFIELDS LIMITED
DISCLAIMER :
Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
Sanctoria,  Post:Dishergarh, Dist. Burdwan -713 333, West Bengal   ~  Tel: 0341-2520052-53, 2520414  ~  FAX:0341-2523574  ~  GRAM:EASTCOAL