PERFORMANCE
REPORT |
PERFORMANCE FOR THE MONTH OF MAY 2009
MONTHWISE
PRODUCTION TARGET ON ECL
Performance for the month of May
2009
| Parameters |
AAP
Target |
Actual |
%
Achvd. AAP Target |
Actual
L/Year |
%
Growth |
| 1.
Coal Prodn. (M.Te) |
| UG |
0.735 |
0.682 |
92.78 |
0.671 |
1.55 |
| OC
(D) |
1.199 |
1.190 |
99.28 |
1.157 |
2.85 |
| Total
Departmental |
1.934 |
1.872
|
96.81
|
1.829
|
2.37
|
| OC(H) |
0.424 |
0.392
|
100.91
|
0.359
|
6.50
|
| Total
Coal Production |
2.358 |
2.264
|
96.02
|
2.253
|
0.50
|
| 2.
O.M.S. (Te) |
1.416 |
1.358
|
95.90
|
1.278
|
6.24
|
| 3.
Despatch (M.Te) |
2.320 |
2.510
|
108.18
|
2.354
|
6.61
|
| 4.
O.B.R. (M.Cum.) |
4.040 |
3.750
|
92.81
|
3.788
|
-1.00
|
| 5.
Composite Prodn. (M.Cum) |
5.437 |
5.684
|
104.54
|
5.283
|
7.59
|
PROGRESSIVE
REPORT FOR MAY 2009
| Parameters |
AAP
Target |
Actual |
%
Achvd. AAP Target |
Actual
L/Year |
%
Growth |
| 1.
Coal Prodn. (M.Te) |
| UG |
1.454 |
1.388 |
95.47 |
1.328 |
4.50 |
| OC
(D) |
2.392 |
2.443 |
102.13 |
2.309 |
5.81 |
| Total
Departmental |
3.846 |
3.381
|
99.61
|
3.637
|
5.33
|
| OC(H) |
0.803 |
0.775
|
96.50
|
0.783
|
-1.05
|
| Total
Coal Production |
4.649 |
4.606
|
99.07
|
4.420
|
4.20
|
| 2.
O.M.S. (Te) |
1.369 |
1.351
|
98.74
|
1.265
|
6.79
|
| 3.
Despatch (M.Te) |
4.596 |
5.138
|
111.80
|
4.672
|
9.99
|
| 4.
O.B.R. (M.Cum.) |
7.942 |
7.869
|
99.08
|
7.619
|
3.29
|
| 5.
Composite Prodn. (M.Cum) |
11.057 |
10.955
|
99.08
|
10.580
|
3.55
|
In the month of May’09
ECL could achieve 22.64 L.Tes against a target of 23.58 L.Tes.
The main reason for shortfall in coal production was due to cyclone
Aila from afternoon of 25.5.09 to morning of 26.5.09 accompanied
by high velocity wind and continuous heavy rainfall. Due to
this coal production particularly in opencast projects of all the
operating areas including Rajmahal and SP Mines was severely
affected and most of the hired OC patches got waterlogged, production
from which could not be normalized till now.
Production from underground mines also suffered due to disruption of
power supply to many mines for long duration as due to cyclone Aila
trees/electric poles were uprooted and overhead lines snapped atmany ny
places. Normal power supply was restored after 2/3 days.
Stock
Liquidation:
Coal stock has been reduced from 2.52 MT (computed based on audited
stock as on 1.4.08) as on 1.4.09 to 1.92 MT as on 31.5.09. Coal stock
at Raniganj Coalfield reduced by about 0.26 MT and same at
Rajmahal reduced by about 0.24 MT
Profitability
During May’09, company made a loss of Rs. 49.12 crore against a loss of
Rs. 2.69 crore during May’08. The Loss during April to May’09 was Rs.
73.97 crore against a loss of Rs. 38.38 crore during April to May’08.
Forestry
clearance:
As advised by Dy. Conservator of Forest, Eastern Regional Office,
Bhubaneswar, a presentation on Hurra ‘C’ project was made by ECL on
30.4.09 at Bhubaneswar. Further a team from Regional Office, Eastern
Region, MOEF, Bhubaneswar inspected the site from 19.5.09 to 21.5.09.
The application for clearance is expected to be forwarded to MOEF, New
Delhi shortly.
Introduction
of Continuous Miner at Sarpi UG mine:
For augmentation of UG production a contract has been signed with Joy
Mining Machinery of UK for introduction of Continuous Miner at Sarpi UG
mine. The equipment is expected to be delivered in October 2009.
Equipment is scheduled to be commissioned in Dec 2009.